EOP Only | Yes |
Frequency | Daily |
Sequential Updates | Yes |
Skip Notes | Should not skip if a new file has been uploaded using Utility 224 "Cost Per Use Import File" |
For more information about End of Period,
refer to U04 End of Period Overview.
Sequential Updates: This EOP module runs as part of U0411 Sequential Updates.
Utility 224 "Cost Per Use Import File" must be used to load meter charge assessments and reversals into the rbm Batch Meter table prior to running this module.
Cost Per Use optional license module is required for this EOP process. For more information on this module, refer to the Cost Per Use overview.
Cost Per Use users: This update assesses and reverses meter charges loaded into the rbm Batch Meter table through Utility 224 "Cost Per Use Import File". The update produces two reports, U0448A Batch Meter Exception and U0448B Batch Meter Audit.